Název: | Studie připojitelnosti elektrárny do elektrizační soustavy |
Další názvy: | Study of the Power Plant's Connectivity to the Power Grid |
Autoři: | Kolerus, Josef |
Vedoucí práce/školitel: | Sirový Martin, Ing. Ph.D. |
Oponent: | Vinš Martin, Ing. et Ing. |
Datum vydání: | 2024 |
Nakladatel: | Západočeská univerzita v Plzni |
Typ dokumentu: | diplomová práce |
URI: | http://hdl.handle.net/11025/56763 |
Klíčová slova: | grid code;g99;power generating unit;power plant model;conditions of connection;phasor-based solution;generator;ac7b excitation;turbine;mass;oltc;pss tuning;reactive capability across the voltage range;frt;lfsm;fsm |
Klíčová slova v dalším jazyce: | grid code;g99;power generating unit;power plant model;conditions of connection;phasor-based solution;generator;ac7b excitation;turbine;mass;oltc;pss tuning;reactive capability across the voltage range;frt;lfsm;fsm |
Abstrakt: | The thesis is focused on simulation and subsequent assessment of grid code tests for a newly connected power production unit to the grid. The issued is solved in Simulink, employing a Phasor-based solution method. The thesis deals with the particular models utilized in the simulation, i.e. Grid, Step-up transformer, Generator, Brushless excitation (type AC7B), Steam turbine and Mass. Custom models are developed either in accordance with standards or by utilizing implementations from the Simulink/Simscape/Power Systems library. In the final stage of the thesis, grid code compliance simulation results are presented. |
Abstrakt v dalším jazyce: | The thesis is focused on simulation and subsequent assessment of grid code tests for a newly connected power production unit to the grid. The issued is solved in Simulink, employing a Phasor-based solution method. The thesis deals with the particular models utilized in the simulation, i.e. Grid, Step-up transformer, Generator, Brushless excitation (type AC7B), Steam turbine and Mass. Custom models are developed either in accordance with standards or by utilizing implementations from the Simulink/Simscape/Power Systems library. In the final stage of the thesis, grid code compliance simulation results are presented. |
Práva: | Plný text práce je přístupný bez omezení |
Vyskytuje se v kolekcích: | Diplomové práce / Theses (KEV) |
Soubory připojené k záznamu:
Soubor | Popis | Velikost | Formát | |
---|---|---|---|---|
DP Kolerus.pdf | Plný text práce | 5,26 MB | Adobe PDF | Zobrazit/otevřít |
PosudekOponentaSTAG-VinsM-272945.pdf | Posudek oponenta práce | 65,53 kB | Adobe PDF | Zobrazit/otevřít |
PosudekVedoucihoSTAG-SirovyM-135027.pdf | Posudek vedoucího práce | 60,47 kB | Adobe PDF | Zobrazit/otevřít |
ProtokolSPrubehemObhajobySTAG.pdf | Průběh obhajoby práce | 41,67 kB | Adobe PDF | Zobrazit/otevřít |
Použijte tento identifikátor k citaci nebo jako odkaz na tento záznam:
http://hdl.handle.net/11025/56763
Všechny záznamy v DSpace jsou chráněny autorskými právy, všechna práva vyhrazena.